Construction of Two-Story Temporary Prefab Workstation
Supply, fitting and installation of UPVC Windows and Door, dismantling of existing windows and preparation of site to fix them on position. Repairing of old lightly damaged windows, modification of windows using double glazed glass shutter and fitting them on the building.
Over Head Tank (OHT) Construction, Pipe laying & jointing of different sizes along with household connection around the Baikunthe Underground Drinking Water Project
Project Completion Report
Client
Ms. Shova Maharjan
Administrative Officer UNICEF ROSA
Lainchaur, Kathmandu